国产成人综合在线观看,一本一道波多野结衣一区二区,影音先锋人妻啪啪AV资源网站 ,蜜臀av午夜精品福利,明星性猛交ⅹxxx乱大交,伊人久久大香线蕉午夜av ,综合久久青青草免费观看视频,精国产品一区二区三区a片
Price composition of electrical equipment
font size:SmallMiddleBig

Price composition of electrical equipment

1、Primary and secondary components price;

2、The price of auxiliary materials, including: secondary wire, terminal, wire nose, wire clip, bobbin, number tube, character code, cable tie, standard parts, etc.;

3、The price of the busbar, the amount of the busbar is budgeted according to the one-time plan diagram;

4、The shell price should be quoted by the dedicated shell manufacturer according to the one-time plan; box-type substations and non-standard boxes (cabinets) are calculated according to the size of the box.

5、Packaging and shipping costs;

6、Comprehensive expenses of the enterprise, including management fees, labor wages, taxes and profits, etc.;

7、Wanshang Power tells you the quotation process and matters needing attention

1、Digest the drawings:

According to the drawings provided by the user, first check the catalog of drawings, and then assign and classify them. Understand the design intent of the project in accordance with the design instructions and technical requirements of the drawings (if there are bidding documents, the technical requirements of the bidding documents), consider the price required for the calculation of the variable scheme, and pay attention to the floor plan (floor plan The above reflects whether there is a busbar bridge and the length of the busbar bridge between the cabinets).

2、Related Notes:

①、As far as high-voltage cabinets are concerned, in order to meet the five-proof requirements, the incoming cabinet needs to be equipped with a live display (mandatory type: DXN-10, 24/35Q) and an electromagnetic lock, and the outgoing cabinet needs to be equipped with a live display (prompt type: DXN-10/35T ) and grounding switch interlocking device.

②、When the two-way power supply is in, consider the self-switching device, and consider the electrical and mechanical interlocking device (three-in-two) between the two-way power supply and the bus tie.

③、Sulfur hexafluoride ring main unit and KYN28-12 central cabinet generally need to be equipped with temperature and humidity controller and heater.

④、If the interphase and interphase-to-ground distances cannot meet the electrification requirements, busbar vulcanization treatment or special-shaped busbars or heat-shrinkable sleeves for busbar sleeves should be used, and the joints should also be covered with an insulating cover.





Updated:2022-07-02 | Back to list
WeChat
WeChat
主站蜘蛛池模板: 五月婷综合| 云和县| 日本熟妇色一本在线视频| 亚洲午夜久久久久久久久电影网| 亚洲国产欧美动漫在线人成| 996久久国产精品线观看| 人妻丝袜乱经典系列| 日韩av一区在线播放| 晋宁县| 激情亚洲AV| 亚洲中文在线观看| 伊人一二三四区| 亚洲综合伦理| 国产日韩欧美一区二区三区乱码 | 人妻无码中出| 精品人妻少妇嫩草AV无码专区| 欧美群妇大交群| 日产精品卡一卡二| AV一区二区三区| 四季av一区二区| 福利姬白浆AV导航| 国产精品亚洲а∨天堂免下载| 国产成人免费高清直播| 狼人大香伊蕉国产www亚洲 | 粗大大国产欧美| 成人免费毛片内射美女-百度| 日本中文一二区有码在线| 性无码专区无码片| 草草久久久无码国产专区| 国产激情99| 成人爽a毛片在线视频| 国产性夜夜春夜夜爽免费下载| 少妇的逼逼| 国产乱色国产精品免费视频| 免费国产在线精品一区二区三区 | 精品自拍视频| 亚洲啊v.在线播放| 亚洲中文字幕久爱亚洲伊人| 日本午夜成年在线网站| 国产又黄又大又粗的视频| 宕昌县|